ITAC Assessment: UD1009
ITAC logo
ITAC Assessment: UD1009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Plasticware
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $50
M
to 100
M
# of Employees 280
Plant Area 200,000
ft2
Annual Production 2,400,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,025,570 35,315,780
kWh
Electricity Demand $381,272 64,404
kW-mo/yr
Electricity Fees $389,878 -
Waste Disposal Costs
Water Usage $36,665 5,712
Tgal
TOTAL YEARLY COSTS $1,833,385
RECOMMENDED SAVINGS* $404,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $151,961

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $32,116 - $25,050
826,616
kWh
$7,066
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,826 $1,000 $6,962
239,751
kWh
$1,944
-
kW-mo/yr
- $(-1,080.0)
03 2.7241: Install outside air damper / economizer on hvac unit $78,282 $44,250 $78,282
2,695,658
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,717 $4,388 $3,785
130,338
kWh
$1,057
-
kW-mo/yr
$(-125.0) -
05 3.4114: Replace city water with recycled water via cooling tower $107,302 $83,000 $93,845
3,231,565
kWh
$13,457
-
kW-mo/yr
- -
06 2.2622: Replace existing chiller with high efficiency model $100,517 $151,300 $78,575
2,705,745
kWh
$21,942
-
kW-mo/yr
- -
07 2.2625: Chill water to the highest temperature possible $73,844 $147,736 $57,724
1,987,754
kWh
$16,120
-
kW-mo/yr
- -
TOTAL RECOMMENDED $404,604 $431,674 $344,223
11,817,427
kWh
$61,586
-
kW-mo/yr
$(-125.0) $(-1,080.0)
TOTAL IMPLEMENTED $151,961 $88,388 $129,642
4,428,270
kWh
$23,524
-
kW-mo/yr
$(-125.0) $(-1,080.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs