771
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
NL0092 #05 Y:2023 | 05 | 2023 | Maintain air filters by cleaning or replacement | $665 | $1,360 | |
NL0092 #03 Y:2023 | 03 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,226 | $2,000 | |
NL0092 #02 Y:2023 | 02 | 2023 | Reschedule plant operations or reduce load to avoid peaks | $8,380 | $140 | |
NL0091 #03 Y:2023 | 03 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,370 | $1,500 | |
NL0091 #02 Y:2023 | 02 | 2023 | Utilize higher efficiency lamps and/or ballasts | $16,289 | $11,473 | |
NL0091 #01 Y:2023 | 01 | 2023 | Improve air circulation with destratification fans / other methods | $28,330 | $57,285 | |
NL0090 #03 Y:2023 | 03 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,382 | $4,500 | |
NL0090 #02 Y:2023 | 02 | 2023 | Utilize higher efficiency lamps and/or ballasts | $7,629 | $7,670 | |
NL0090 #01 Y:2023 | 01 | 2023 | Improve air circulation with destratification fans / other methods | $10,602 | $19,848 | |
NL0089 #05 Y:2023 | 05 | 2023 | Use solar heat to make electricty | $722 | $125 | |
NL0089 #04 Y:2023 | 04 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $1,309 | $1,800 | |
NL0089 #03 Y:2023 | 03 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,535 | $5,000 | |
NL0089 #02 Y:2023 | 02 | 2023 | Recover waste heat from equipment | $3,790 | $15,516 | |
NL0088 #06 Y:2023 | 06 | 2023 | Eliminate or reduce compressed air usage | $92 | $80 | |
NL0088 #05 Y:2023 | 05 | 2023 | Minimize water usage | $311 | $230 | |
NL0088 #04 Y:2023 | 04 | 2023 | Change rate schedules or other changes in utility service | $988 | $40 | |
NL0088 #03 Y:2023 | 03 | 2023 | Apply for tax-free status for energy purchases | $1,828 | $160 | |
NL0088 #02 Y:2023 | 02 | 2023 | Meter waste water | $4,109 | $320 | |
NL0086 #03 Y:2023 | 03 | 2023 | Meter waste water | $4,239 | $1,348 | |
NL0086 #02 Y:2023 | 02 | 2023 | Insulate bare equipment | $6,202 | $6,211 |