Assessment Year | 2023 |
---|---|
Principal Product | Refrigeration and Heating Equipment |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $100 M to 500M |
# of Employees | 430 |
Plant Area |
234,000
ft2
|
Annual Production | 15,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $303,460 | 5,751,200 |
kWh
|
$0.053 | |
Electricity Demand | $116,749 | 14,258 |
kW-mo/yr
|
$8.19 | |
Electricity Fees | $57,107 | - |
|
- | |
Natural Gas | $209,736 | 23,132 |
MMBtu
|
$9.07 | |
Waste Disposal Costs | |||||
Water Usage | $15,560 | 5,823 |
Tgal
|
$2.67 | |
Water Disposal | $18,507 | 5,823 |
Tgal
|
$3.18 | |
TOTAL YEARLY COSTS | $721,119 | ||||
RECOMMENDED SAVINGS* | $13,239 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4224: Upgrade controls on compressors | $4,883 | $6,825 |
$4,883
92,126
kWh
|
- | - | - | - | - | |
02 | 2.2437: Recover waste heat from equipment | $3,790 | $15,516 | - | - | - |
$3,790
-
MMBtu
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,535 | $5,000 |
$3,035
57,259
kWh
|
- | - | - | $(-400.0) | $(-100.0) | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,309 | $1,800 |
$1,009
19,040
kWh
|
$300
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.9114: Use solar heat to make electricty | $722 | $125 |
$27,235
515,809
kWh
|
- | $(-26,513.0) | - | - | - | |
TOTAL RECOMMENDED | $13,239 | $29,266 |
$36,162
684,234
kWh
|
$300
-
kW-mo/yr
|
$(-26,513.0) |
$3,790
-
MMBtu
|
$(-400.0) | $(-100.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs