Assessment Year | 2022 |
---|---|
Principal Product | Recycled PET raw materials |
NAICS | 562920: Materials Recovery Facilities |
SIC | 4953: Refuse Systems |
Sales Range | $5 M to 10M |
# of Employees | 13 |
Plant Area |
50,000
ft2
|
Annual Production | 22,000,000
lb
|
Production Hrs. Annual | 7,437
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,777 | 1,683,832 |
kWh
|
$0.043 |
Electricity Demand | $37,402 | 4,000 |
kW-mo/yr
|
$9.35 |
Electricity Fees | $1,620 | - |
|
- |
Natural Gas | $188,852 | 55,032 |
MMBtu
|
$3.43 |
TOTAL YEARLY COSTS | $299,651 | |||
RECOMMENDED SAVINGS* | $134,871 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,333 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $9,300 | $14,300 | - |
$9,300
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.2121: Increase amount of condensate returned | $1,157 | $360 | - | - | - |
$275
-
MMBtu
|
$882
-
Tgal
|
- | |
03 | 4.212: Adopt in-house material generation | $15,440 | $21,500 |
$(-6,760.0)
(-158,700)
kWh
|
$(-2,400.0)
-
kW-mo/yr
|
- | - | - | $24,600 | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,625 | $37,000 |
$18,625
437,200
kWh
|
- | - | - | - | - | |
05 | 2.7135: Install occupancy sensors | $3,395 | $1,530 |
$2,315
54,400
kWh
|
$1,080
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.8123: Pay utility bills on time | $344 | - | - | - | $344 | - | - | - | |
07 | 2.2113: Repair or replace steam traps | $6,765 | $560 | - | - | - |
$6,765
-
MMBtu
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $535 | $830 |
$400
9,320
kWh
|
$175
-
kW-mo/yr
|
- | - | - | $(-40.0) | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,245 | $1,000 |
$5,350
125,600
kWh
|
$1,895
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $362 | $30 |
$268
6,288
kWh
|
$94
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.9114: Use solar heat to make electricty | $71,703 | $867,640 |
$71,703
1,683,184
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $134,871 | $944,750 |
$91,901
2,157,292
kWh
|
$10,144
-
kW-mo/yr
|
$344 |
$7,040
-
MMBtu
|
$882
-
Tgal
|
$24,560 | ||
TOTAL IMPLEMENTED | $44,333 | $54,080 |
$24,643
578,408
kWh
|
$11,464
-
kW-mo/yr
|
$344 |
$7,040
-
MMBtu
|
$882
-
Tgal
|
$(-40.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs