ITAC Assessment: MO0212
ITAC logo
ITAC Assessment: MO0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Trigger Sprayers & Lotion Pumps
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 60,000
ft2
Annual Production 200,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $681,486 16,908,851
kWh
Electricity Demand $46,979 2,376
kW-mo/yr
Electricity Fees $53,528 -
Natural Gas $19,219 3,364
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,318

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.711: Initiate a total quality management program $21,647 $25,000 - - - - $21,647
02 4.611: Begin a practice of predictive / preventative maintenance $15,105 $3,500 - - - - $15,105
03 4.432: Cross-train personnel to avoid lost time $9,280 $20,000 - - - - $9,280
04 4.514: Re-arrange equipment layout to reduce handling costs $4,800 $12,500 - - - - $4,800
05 2.7142: Utilize higher efficiency lamps and/or ballasts $625 $430 $524
12,016
kWh
$101
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,508 $3,904 $1,263
29,015
kWh
$245
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $307 $690 $291
6,741
kWh
$16
-
kW-mo/yr
- - -
08 2.4221: Install compressor air intakes in coolest locations $10,846 $325 $10,312
236,518
kWh
$534
-
kW-mo/yr
- - -
09 2.4314: Use synthetic lubricant $5,395 $1,760 $5,130
117,526
kWh
$265
-
kW-mo/yr
- - -
10 2.4133: Use most efficient type of electric motors $9,751 $11,356 $9,235
211,899
kWh
$516
-
kW-mo/yr
- - -
11 3.5311: Recover and reuse waste material $17,461 $1,000 - - - $17,461
-
lb
-
12 2.4313: Provide proper maintenance of motor driven equipment $4,018 $800 - - $4,018
-
gal
- -
TOTAL RECOMMENDED $100,743 $81,265 $26,755
613,715
kWh
$1,677
-
kW-mo/yr
$4,018
-
gal
$17,461
-
lb
$50,832
TOTAL IMPLEMENTED $95,318 $68,335 $26,231
601,699
kWh
$1,576
-
kW-mo/yr
$4,018
-
gal
$17,461
-
lb
$46,032
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs