ITAC Assessment: MZ0054
ITAC logo
ITAC Assessment: MZ0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product paving and roofing products
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 10
Plant Area 65,000
ft2
Annual Production 15,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,965 1,640,285
kWh
Electricity Demand $28,365 5,028
kW-mo/yr
Natural Gas $234,667 31,356
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $97,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $2,366 $1,054 - - $2,366
-
MMBtu
02 2.2511: Insulate bare equipment $3,852 $940 - - $3,852
-
MMBtu
03 2.2437: Recover waste heat from equipment $24,485 $30,000 - - $24,485
-
MMBtu
04 2.2437: Recover waste heat from equipment $60,827 $30,000 - - $60,827
-
MMBtu
05 2.4133: Use most efficient type of electric motors $2,942 $17,975 $2,625
29,170
kWh
$317
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,678 $2,840 $2,390
26,557
kWh
$288
-
kW-mo/yr
-
TOTAL RECOMMENDED $97,150 $82,809 $5,015
55,727
kWh
$605
-
kW-mo/yr
$91,530
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs