| Assessment Year | 2008 |
|---|---|
| Principal Product | Foil Backing |
| NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
| SIC | 3497: Metal Foil and Leaf |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
100,000
ft2
|
| Annual Production | 360,000
thousand feet
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $92,638 | 2,105,400 |
kWh
|
$0.044 |
| Electricity Demand | $50,418 | 4,201 |
kW-mo/yr
|
$12.00 |
| Electricity Fees | $2,146 | - |
|
- |
| Natural Gas | $628,401 | 61,565 |
MMBtu
|
$10.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $182,931 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $172,142 | $1,000 | - | - | - |
$172,142
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,660 | $8,899 |
$3,163
71,896
kWh
|
$1,438
-
kW-mo/yr
|
$59 | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,458 | $256 |
$2,443
55,516
kWh
|
- | $15 | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,327 | $7,955 |
$1,572
357,330
kWh
|
$720
-
kW-mo/yr
|
$35 | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $844 | $1,500 |
$376
8,538
kWh
|
$456
-
kW-mo/yr
|
$12 | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $500 | $912 |
$301
6,843
kWh
|
$192
-
kW-mo/yr
|
$7 | - | |
| TOTAL RECOMMENDED | $182,931 | $20,522 |
$7,855
500,123
kWh
|
$2,806
-
kW-mo/yr
|
$128 |
$172,142
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||