ITAC Assessment: AM0899
ITAC logo
ITAC Assessment: AM0899
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Elementary School Students
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 60,850
ft2
Annual Production 100
units
Production Hrs. Annual 3,377
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,788 606,778
kWh
Electricity Demand $3,118 236
kW-mo/yr
Natural Gas $991 96
MMBtu
TOTAL YEARLY COSTS $29,897
RECOMMENDED SAVINGS* $29,899 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 3.7311: Maintain machines to reduce leaks $4,537 $5,000 $3,809
89,614
kWh
- $728
-
MMBtu
02 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $711 $23,638 $448
10,535
kWh
- $263
-
MMBtu
03 2.9114: Use solar heat to make electricty $23,352 $530,400 $20,367
479,212
kWh
$2,985
-
kW-mo/yr
-
04 2.5123: Reduce fluid flow rates $1,045 $3,000 $1,045
24,580
kWh
- -
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $254 $1,314 $121
2,837
kWh
$133
-
kW-mo/yr
-
TOTAL RECOMMENDED $29,899 $563,352 $25,790
606,778
kWh
$3,118
-
kW-mo/yr
$991
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs