| Assessment Year | 2024 |
|---|---|
| Principal Product | Corrugated Boxes |
| NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 69 |
| Plant Area |
257,000
ft2
|
| Annual Production | 200,000
thousand feet
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $105,425 | 1,446,310 |
kWh
|
$0.073 | |
| Electricity Demand | $97,046 | 8,205 |
kW-mo/yr
|
$11.83 | |
| Electricity Fees | $26,052 | - |
|
- | |
| Natural Gas | $96,604 | 10,000 |
MMBtu
|
$9.66 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,498 | 1,026 |
Tgal
|
$2.44 | |
| Water Disposal | $827 | 287 |
Tgal
|
$2.89 | |
| TOTAL YEARLY COSTS | $328,452 | ||||
| RECOMMENDED SAVINGS* | $23,891 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $10,271 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.6231: Utilize controls to operate equipment only when needed | $12,092 | $3,305 |
$6,798
93,250
kWh
|
$5,294
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,380 | $140 | - |
$8,800
-
kW-mo/yr
|
- | $(-420.0) | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,226 | $2,000 |
$1,746
23,956
kWh
|
- | - | $(-420.0) | $(-100.0) | |
| 04 | 2.8112: Combine utility meters | $948 | $1,000 | - | - | $948 | - | - | |
| 05 | 2.6127: Maintain air filters by cleaning or replacement | $665 | $1,360 | - | - | - | $665 | - | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $580 | $105 |
$580
7,951
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $23,891 | $7,910 |
$9,124
125,157
kWh
|
$14,094
-
kW-mo/yr
|
$948 | $(-175.0) | $(-100.0) | ||
| TOTAL IMPLEMENTED | $10,271 | $3,500 |
$1,746
23,956
kWh
|
$8,800
-
kW-mo/yr
|
- | $(-175.0) | $(-100.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs