ITAC Assessment: NL0091
ITAC logo
ITAC Assessment: NL0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Roof Trusses
NAICS 321918: Other Millwork (including Flooring)
SIC 2439: Structural Wood Members, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 290,000
ft2
Annual Production 12,500
thousand feet
Production Hrs. Annual 5,250
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,742 1,973,293
kWh
Electricity Demand $76,464 4,468
kW-mo/yr
Electricity Fees $10,492 -
Natural Gas $177,671 13,306
MMBtu
Waste Disposal Costs
Water Usage $2,790 449
Tgal
TOTAL YEARLY COSTS $319,159
RECOMMENDED SAVINGS* $46,712 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,989

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.7243: Improve air circulation with destratification fans / other methods $28,330 $57,285 $(-478.7)
(-18,270)
kWh
$(-1,191.3)
-
kW-mo/yr
- - $30,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $16,289 $11,473 $6,534
249,375
kWh
$9,755
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,370 $1,500 $1,726
65,888
kWh
- $(-256.0) $(-100.0) -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $507 $1,064 $105
3,994
kWh
$94
-
kW-mo/yr
$308 - -
05 2.4239: Eliminate or reduce compressed air usage $216 $128 $216
8,245
kWh
- - - -
TOTAL RECOMMENDED $46,712 $71,450 $8,102
309,232
kWh
$8,658
-
kW-mo/yr
$52 $(-100.0) $30,000
TOTAL IMPLEMENTED $45,989 $70,258 $7,781
296,993
kWh
$8,564
-
kW-mo/yr
$(-256.0) $(-100.0) $30,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs