Assessment Year | 2019 |
---|---|
Principal Product | high voltage insul & protection |
NAICS | 334419: Other Electronic Component Manufacturing |
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
225,000
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 5,920
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $680,494 | 9,244,204 |
kWh
|
$0.074 | |
Electricity Demand | $147,721 | 22,382 |
kW-mo/yr
|
$6.60 | |
Natural Gas | $12,077 | 1,051 |
MMBtu
|
$11.49 | |
Waste Disposal Costs | |||||
Water Usage | $4,638 | 776 |
Tgal
|
$5.98 | |
Water Disposal | $8,163 | 776 |
Tgal
|
$10.52 | |
Solid Waste (haz) | $26,076 | 20,238 |
lb
|
$1.29 | |
TOTAL YEARLY COSTS | $879,169 | ||||
RECOMMENDED SAVINGS* | $61,091 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $28,237 | $41,608 |
$23,514
317,757
kWh
|
$4,723
-
kW-mo/yr
|
- | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $10,401 | $5,725 |
$8,661
117,046
kWh
|
$1,740
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,809 | $11,080 |
$14,281
192,992
kWh
|
$2,528
-
kW-mo/yr
|
- | |
04 | 2.7442: Keep doors and windows shut when not on use | $1,156 | - |
$1,156
16,517
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,091 | - |
$3,457
47,360
kWh
|
$634
-
kW-mo/yr
|
- | |
06 | 4.812: Apply for investment incentives | $397 | - | - | - | $397 | |
TOTAL RECOMMENDED | $61,091 | $58,413 |
$51,069
691,672
kWh
|
$9,625
-
kW-mo/yr
|
$397 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs