ITAC Assessment: CL1908
ITAC logo
ITAC Assessment: CL1908
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product high voltage insul & protection
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 225,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 5,920
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $680,494 9,244,204
kWh
Electricity Demand $147,721 22,382
kW-mo/yr
Natural Gas $12,077 1,051
MMBtu
Waste Disposal Costs
Water Usage $4,638 776
Tgal
Water Disposal $8,163 776
Tgal
Solid Waste (haz) $26,076 20,238
lb
TOTAL YEARLY COSTS $879,169
RECOMMENDED SAVINGS* $61,091 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $28,237 $41,608 $23,514
317,757
kWh
$4,723
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $10,401 $5,725 $8,661
117,046
kWh
$1,740
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,809 $11,080 $14,281
192,992
kWh
$2,528
-
kW-mo/yr
-
04 2.7442: Keep doors and windows shut when not on use $1,156 - $1,156
16,517
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,091 - $3,457
47,360
kWh
$634
-
kW-mo/yr
-
06 4.812: Apply for investment incentives $397 - - - $397
TOTAL RECOMMENDED $61,091 $58,413 $51,069
691,672
kWh
$9,625
-
kW-mo/yr
$397
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs