ITAC Assessment: MA0024
ITAC logo
ITAC Assessment: MA0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product TIMER MOTORS & TIMERS
NAICS
n/a
SIC 3873: Watches, Clocks, Clockwork Operated Devices, and Parts
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 7,500,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $289,977 3,235,932
kWh
Natural Gas $17,332 3,073
MMBtu
Fuel Oil #6 $31,008 6,126
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,872

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.4221: Install compressor air intakes in coolest locations $735 $378 $735
8,206
kWh
- -
02 2.1212: Operate boilers on high fire setting $2,731 $6,200 - $(-3,999.0)
-
MMBtu
$6,730
-
MMBtu
03 2.2491: Use cooling air which cools hot work pieces for space heating $17,848 $12,090 - $9,408
-
MMBtu
$8,440
-
MMBtu
04 2.8115: Base utility charges on usage rather than area occupied $6,406 $2,900 - - $6,406
-
MMBtu
TOTAL RECOMMENDED $27,720 $21,568 $735
8,206
kWh
$5,409
-
MMBtu
$21,576
-
MMBtu
TOTAL IMPLEMENTED $9,872 $9,478 $735
8,206
kWh
$(-3,999.0)
-
MMBtu
$13,136
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs