Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Misc. Sheet Metal Work
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 210,000
ft2
Annual Production 56,250
units
Production Hrs. Annual 4,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,014 2,392,077
kWh
Electricity Demand $45,216 8,040
kW-mo/yr
Natural Gas $4,631 545
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,667 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,742

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $55,045 $24,738 $48,806
351,120
kWh
$6,239
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $540 $370 $510
3,669
kWh
$30
-
kW-mo/yr
03 2.2511: Insulate bare equipment $12,153 $1,123 $12,153
87,430
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $232 $340 $185
1,326
kWh
$47
-
kW-mo/yr
05 2.3212: Optimize plant power factor $12,697 $25,000 - $12,697
-
kW-mo/yr
TOTAL RECOMMENDED $80,667 $51,571 $61,654
443,545
kWh
$19,013
-
kW-mo/yr
TOTAL IMPLEMENTED $67,742 $49,738 $48,806
351,120
kWh
$18,936
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs