ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
BS0111 #06 Y:2018 | 06 | 2018 | Reduce the pressure of compressed air to the minimum required | $1,713 | $20 | |
BS0111 #05 Y:2018 | 05 | 2018 | Utilize energy-efficient belts and other improved mechanisms | $1,250 | $60 | |
BS0111 #04 Y:2018 | 04 | 2018 | Use closed cycle process to minimize waste water production | $10,878 | $1,225 | |
BS0111 #03 Y:2018 | 03 | 2018 | Utilize higher efficiency lamps and/or ballasts | $1,707 | $2,970 | |
BS0111 #02 Y:2018 | 02 | 2018 | Isolate steam lines to avoid heating air conditioned areas | $768 | $1,485 | |
BS0111 #01 Y:2018 | 01 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,853 | $2,250 | |
BS0106 #03 Y:2017 | 03 | 2017 | Re-size charging openings or add movable cover or door | $2,159 | $710 | |
BS0106 #02 Y:2017 | 02 | 2017 | Utilize energy-efficient belts and other improved mechanisms | $185 | $48 | |
BS0106 #01 Y:2017 | 01 | 2017 | Install compressor air intakes in coolest locations | $374 | $275 | |
BS0105 #03 Y:2017 | 03 | 2017 | Utilize higher efficiency lamps and/or ballasts | $78 | $165 | |
BS0105 #02 Y:2017 | 02 | 2017 | Utilize higher efficiency lamps and/or ballasts | $892 | $1,020 | |
CO0536 #02 Y:2003 | 02 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,530 | $1,050 | |
CO0535 #08 Y:2003 | 08 | 2003 | Utilize higher efficiency lamps and/or ballasts | $411 | $112 | |
CO0535 #05 Y:2003 | 05 | 2003 | Utilize higher efficiency lamps and/or ballasts | $3,250 | $9,690 | |
CO0535 #04 Y:2003 | 04 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,340 | $750 | |
CO0535 #03 Y:2003 | 03 | 2003 | Use / purchase optimum sized compressor | $7,160 | $15,760 | |
CO0535 #02 Y:2003 | 02 | 2003 | Turn off equipment during breaks, reduce operating time | $9,820 | $6,420 | |
UU0039 #09 Y:2002 | 09 | 2002 | Reschedule plant operations or reduce load to avoid peaks | $7,608 | - | |
UU0039 #08 Y:2002 | 08 | 2002 | Optimize plant power factor | $695 | $695 | |
UU0039 #07 Y:2002 | 07 | 2002 | Eliminate or reduce compressed air usage | $199 | $660 |