Assessment Year | 2003 |
---|---|
Principal Product | customized metal works |
NAICS | 332431: Metal Can Manufacturing |
SIC | 3411: Metal Cans |
Sales Range | $1 M to 5M |
# of Employees | 40 |
Plant Area |
180,000
ft2
|
Annual Production | 8,000
pieces
|
Production Hrs. Annual | 7,100
hrs
|
Location (State) | Montana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $45,521 | 1,331,440 |
kWh
|
$0.034 |
Electricity Demand | $29,304 | 69,084 |
kW-mo/yr
|
$0.42 |
Natural Gas | $47,351 | 9,809 |
MMBtu
|
$4.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,842 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,855 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $5,610 | $9,000 |
$4,480
134,004
kWh
|
$1,130
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,754 | $600 |
$2,200
65,684
kWh
|
$554
-
kW-mo/yr
|
- | - | |
03 | 2.4235: Remove or close off unneeded compressed air lines | $1,286 | $1,085 |
$1,027
30,720
kWh
|
$259
-
kW-mo/yr
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $1,929 | $300 | - | - |
$1,929
-
MMBtu
|
- | |
05 | 2.2511: Insulate bare equipment | $1,012 | $832 | - | - |
$1,012
-
MMBtu
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $703 | $237 |
$561
16,787
kWh
|
$142
-
kW-mo/yr
|
- | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $199 | $660 |
$159
4,767
kWh
|
$40
-
kW-mo/yr
|
- | - | |
08 | 2.3212: Optimize plant power factor | $695 | $695 | - |
$695
-
kW-mo/yr
|
- | - | |
09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,608 | - | - |
$7,608
-
kW-mo/yr
|
- | - | |
10 | 3.3123: Use decanting, flotation to remove contaminants | $1,046 | $1,342 | - | - | - |
$1,046
-
Tgal
|
|
TOTAL RECOMMENDED | $22,842 | $14,751 |
$8,427
251,962
kWh
|
$10,428
-
kW-mo/yr
|
$2,941
-
MMBtu
|
$1,046
-
Tgal
|
||
TOTAL IMPLEMENTED | $18,855 | $12,277 |
$8,427
251,962
kWh
|
$10,428
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs