| Assessment Year | 2014 |
|---|---|
| Principal Product | Crumb Rubber |
| NAICS | 326211: Tire Manufacturing (except Retreading) |
| SIC | 3011: Tires and Inner Tubes |
| Sales Range | $10 M to 50M |
| # of Employees | 68 |
| Plant Area |
22,400
ft2
|
| Annual Production | 40,000,000
lb
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $180,074 | 4,832,000 |
kWh
|
$0.037 |
| Electricity Demand | $82,421 | 13,322 |
kW-mo/yr
|
$6.19 |
| Electricity Fees | $23,718 | - |
|
- |
| Natural Gas | $16,580 | 2,463 |
MMBtu
|
$6.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,031 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,276 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4321: Upgrade obsolete equipment | $17,374 | $52,122 |
$13,764
366,088
kWh
|
$3,610
-
kW-mo/yr
|
- | |
| 02 | 2.7134: Use photocell controls | $1,548 | $480 |
$884
23,535
kWh
|
$664
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,054 | $450 |
$834
22,088
kWh
|
$220
-
kW-mo/yr
|
- | |
| 04 | 2.4321: Upgrade obsolete equipment | $178 | $35 |
$141
3,744
kWh
|
$37
-
kW-mo/yr
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,381 | $3,364 | - | - |
$2,381
-
MMBtu
|
|
| 06 | 2.7144: Install spectral reflectors / delamp | $496 | $105 |
$393
10,446
kWh
|
$103
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $23,031 | $56,556 |
$16,016
425,901
kWh
|
$4,634
-
kW-mo/yr
|
$2,381
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $3,276 | $1,070 |
$2,252
59,813
kWh
|
$1,024
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs