ITAC Assessment: MI0172
ITAC logo
ITAC Assessment: MI0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Tempered Glass
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 238
Plant Area 125,000
ft2
Annual Production 25,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $889,757 9,572,000
kWh
Electricity Demand $120,134 30,041
kW-mo/yr
Electricity Fees $6,323 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $232,686 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $106,686

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 4.453: Reschedule breaks to allow for continuous production $126,000 $66,640 - - $126,000
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $86,926 $83,640 $70,934
884,318
kWh
$15,992
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,860 $8,778 $8,516
106,157
kWh
$1,344
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,695 $1,210 $1,581
19,708
kWh
$114
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $343 $24 $131
1,513
kWh
$212
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,883 $1,210 $1,167
14,545
kWh
$3,716
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,251 $24 $504
6,285
kWh
$1,747
-
kW-mo/yr
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $728 $1,200 $629
7,845
kWh
$99
-
kW-mo/yr
-
TOTAL RECOMMENDED $232,686 $162,726 $83,462
1,040,371
kWh
$23,224
-
kW-mo/yr
$126,000
TOTAL IMPLEMENTED $106,686 $96,086 $83,462
1,040,371
kWh
$23,224
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs