Assessment Year | 2011 |
---|---|
Principal Product | Airplane seats |
NAICS | 336360: Motor Vehicle Seating and Interior Trim Manufacturing |
SIC | 2531: Public Building and Related Furniture |
Sales Range | $100 M to 500M |
# of Employees | 164 |
Plant Area |
97,000
ft2
|
Annual Production | 5,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $65,515 | 1,322,080 |
kWh
|
$0.050 |
Electricity Demand | $16,431 | 4,290 |
kW-mo/yr
|
$3.83 |
Electricity Fees | $6,004 | - |
|
- |
Natural Gas | $10,525 | 741 |
MMBtu
|
$14.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,728 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,516 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $967 | $25 |
$967
19,500
kWh
|
- | - | - | - | |
02 | 2.2437: Recover waste heat from equipment | $1,212 | $2,582 | - | - |
$1,212
-
MMBtu
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $174 | $50 |
$148
2,985
kWh
|
$26
-
kW-mo/yr
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $363 | $100 |
$487
9,818
kWh
|
$86
-
kW-mo/yr
|
- | $(-120.0) | $(-90.0) | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $873 | $50 |
$667
13,440
kWh
|
$206
-
kW-mo/yr
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $139 | $517 |
$139
2,812
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $3,728 | $3,324 |
$2,408
48,555
kWh
|
$318
-
kW-mo/yr
|
$1,212
-
MMBtu
|
$(-120.0) | $(-90.0) | ||
TOTAL IMPLEMENTED | $2,516 | $742 |
$2,408
48,555
kWh
|
$318
-
kW-mo/yr
|
- | $(-120.0) | $(-90.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs