ITAC Assessment: TT0029
ITAC logo
ITAC Assessment: TT0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Commercial Heat Treating
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 21,000
ft2
Annual Production 891,000
ton
Production Hrs. Annual 6,800
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $155,427 3,109,800
kWh
Electricity Demand $103,211 9,928
kW-mo/yr
Electricity Fees $4,735 -
Natural Gas $153,365 12,941
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,685 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,155

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,600 $12,000 $4,000
71,808
kWh
$1,500
-
kW-mo/yr
$1,100 -
02 2.2511: Insulate bare equipment $52,700 $1,000 $35,500
646,273
kWh
$17,200
-
kW-mo/yr
- -
03 2.1135: Repair furnaces and oven doors so that they seal efficiently $7,050 $2,000 $5,050
91,800
kWh
$2,000
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $1,060 $250 $760
13,797
kWh
$300
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $1,250 $250 - - - $1,250
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,170 $2,000 $1,170
21,197
kWh
- - -
07 2.3212: Optimize plant power factor $4,855 $13,300 - - $4,855 -
TOTAL RECOMMENDED $74,685 $30,800 $46,480
844,875
kWh
$21,000
-
kW-mo/yr
$5,955 $1,250
-
MMBtu
TOTAL IMPLEMENTED $64,155 $26,300 $39,500
718,081
kWh
$18,700
-
kW-mo/yr
$5,955 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs