| Assessment Year | 2003 |
|---|---|
| Principal Product | Acoustic guitars |
| NAICS | 339992: Musical Instrument Manufacturing |
| SIC | 3931: Musical Instruments |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
20,750
ft2
|
| Annual Production | 12,000
pieces
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | Montana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $76,074 | 1,873,280 |
kWh
|
$0.041 |
| Electricity Demand | $28,946 | 3,604 |
kW-mo/yr
|
$8.03 |
| Electricity Fees | $96 | - |
|
- |
| Natural Gas | $51,323 | 10,018 |
MMBtu
|
$5.12 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $88,931 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $25,981 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $30,840 | $6,420 |
$3,990
83,500
kWh
|
- |
$26,850
-
MMBtu
|
- | - | |
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $9,820 | $6,420 |
$9,820
205,800
kWh
|
- | - | - | - | |
| 03 | 2.4226: Use / purchase optimum sized compressor | $7,160 | $15,760 |
$7,160
150,100
kWh
|
- | - | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,340 | $750 |
$4,340
90,800
kWh
|
$1,000
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,250 | $9,690 |
$2,550
53,500
kWh
|
$1,100
-
kW-mo/yr
|
- | - | $(-400.0) | |
| 06 | 2.2511: Insulate bare equipment | $1,100 | $2,820 |
$590
12,400
kWh
|
$510
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $670 | $1,210 | - |
$670
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $411 | $112 |
$318
6,669
kWh
|
$135
-
kW-mo/yr
|
- | - | $(-42.0) | |
| 09 | 4.426: Modify workload | $30,340 | $6,600 | - | - | - | $43,840 | $(-13,500.0) | |
| TOTAL RECOMMENDED | $88,931 | $49,782 |
$28,768
602,769
kWh
|
$3,415
-
kW-mo/yr
|
$26,850
-
MMBtu
|
$43,840 | $(-13,942.0) | ||
| TOTAL IMPLEMENTED | $25,981 | $32,732 |
$24,188
506,869
kWh
|
$2,235
-
kW-mo/yr
|
- | - | $(-442.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||