Assessment Year | 2003 |
---|---|
Principal Product | Acoustic guitars |
NAICS | 339992: Musical Instrument Manufacturing |
SIC | 3931: Musical Instruments |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
20,750
ft2
|
Annual Production | 12,000
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Montana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $76,074 | 1,873,280 |
kWh
|
$0.041 |
Electricity Demand | $28,946 | 3,604 |
kW-mo/yr
|
$8.03 |
Electricity Fees | $96 | - |
|
- |
Natural Gas | $51,323 | 10,018 |
MMBtu
|
$5.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $88,931 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,981 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $30,840 | $6,420 |
$3,990
83,500
kWh
|
- |
$26,850
-
MMBtu
|
- | - | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $9,820 | $6,420 |
$9,820
205,800
kWh
|
- | - | - | - | |
03 | 2.4226: Use / purchase optimum sized compressor | $7,160 | $15,760 |
$7,160
150,100
kWh
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,340 | $750 |
$4,340
90,800
kWh
|
$1,000
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,250 | $9,690 |
$2,550
53,500
kWh
|
$1,100
-
kW-mo/yr
|
- | - | $(-400.0) | |
06 | 2.2511: Insulate bare equipment | $1,100 | $2,820 |
$590
12,400
kWh
|
$510
-
kW-mo/yr
|
- | - | - | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $670 | $1,210 | - |
$670
-
kW-mo/yr
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $411 | $112 |
$318
6,669
kWh
|
$135
-
kW-mo/yr
|
- | - | $(-42.0) | |
09 | 4.426: Modify workload | $30,340 | $6,600 | - | - | - | $43,840 | $(-13,500.0) | |
TOTAL RECOMMENDED | $88,931 | $49,782 |
$28,768
602,769
kWh
|
$3,415
-
kW-mo/yr
|
$26,850
-
MMBtu
|
$43,840 | $(-13,942.0) | ||
TOTAL IMPLEMENTED | $25,981 | $32,732 |
$24,188
506,869
kWh
|
$2,235
-
kW-mo/yr
|
- | - | $(-442.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs