ITAC Assessment: SD0046
ITAC logo
ITAC Assessment: SD0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product ENVIRON. MONITOR EQUIP.
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area
n/a
Annual Production 150
pieces
Production Hrs. Annual 4,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,346 959,848
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,222 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $40 $98 $40
293
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $418 $60 $418
3,810
kWh
-
03 2.7261: Install timers and/or thermostats $10,111 $600 $10,111
92,028
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,768 - $1,944
17,585
kWh
$(-176.0)
05 2.7144: Install spectral reflectors / delamp $6,470 $5,480 $5,847
53,341
kWh
$623
06 2.6232: Install set-back timers $1,223 $2,680 $1,069
8,499
kWh
$154
07 2.7142: Utilize higher efficiency lamps and/or ballasts $719 $3,300 $719
6,448
kWh
-
08 2.7134: Use photocell controls $473 $115 $363
3,224
kWh
$110
TOTAL RECOMMENDED $21,222 $12,333 $20,511
185,228
kWh
$711
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs