Assessment Year | 1997 |
---|---|
Principal Product | Steel drums |
NAICS |
n/a
|
SIC | 3412: Metal Shipping Barrels, Drums, Kegs, and Pails |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
25,000
ft2
|
Annual Production | 550,000
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $152,853 | 2,541,911 |
kWh
|
$0.060 |
Electricity Demand | $15,579 | 577 |
kW-mo/yr
|
$27.00 |
Natural Gas | $132,657 | 55,096 |
MMBtu
|
$2.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,189 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,401 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.452: Eliminate shift | $17,788 | $6,950 | - | - | - | $17,788 | |
02 | 2.7141: Lower light fixtures in high ceiling areas | $5,426 | $11,087 |
$4,939
84,408
kWh
|
$487
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,291 | $3,370 |
$1,175
20,223
kWh
|
$116
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,086 | $2,477 |
$988
16,999
kWh
|
$98
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,323 | $4,055 |
$1,323
19,050
kWh
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $275 | $363 | - | - |
$275
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $27,189 | $28,302 |
$8,425
140,680
kWh
|
$701
-
kW-mo/yr
|
$275
-
MMBtu
|
$17,788 | ||
TOTAL IMPLEMENTED | $9,401 | $21,352 |
$8,425
140,680
kWh
|
$701
-
kW-mo/yr
|
$275
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs