ITAC Assessment: BS0105
ITAC logo
ITAC Assessment: BS0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Malt Beverages
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 25,000
ft2
Annual Production 1,550
Tgal
Production Hrs. Annual 2,080
hrs
Location (State) Montana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,098 945,360
kWh
Electricity Demand $35,355 3,214
kW-mo/yr
Electricity Fees $462 -
Natural Gas $53,346 13,879
MMBtu
Waste Disposal Costs
Gaseous Waste $2,964 15,600
lb
TOTAL YEARLY COSTS $130,225
RECOMMENDED SAVINGS* $8,421 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $970

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Gaseous Waste Savings
01 3.5311: Recover and reuse waste material $7,451 $31,180 - - $7,451
-
lb
02 2.7142: Utilize higher efficiency lamps and/or ballasts $892 $1,020 $470
11,648
kWh
$422
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $78 $165 $78
1,945
kWh
- -
TOTAL RECOMMENDED $8,421 $32,365 $548
13,593
kWh
$422
-
kW-mo/yr
$7,451
-
lb
TOTAL IMPLEMENTED $970 $1,185 $548
13,593
kWh
$422
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs