ITAC Assessment: AS0265
ITAC logo
ITAC Assessment: AS0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Electronic Components
NAICS
n/a
SIC 3675: Electronic Capacitors
Sales Range $500
k
to 1
M
# of Employees 15
Plant Area 30,000
ft2
Annual Production 4,700,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,591 210,727
kWh
Electricity Fees $1,283 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,516 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,958 $7,252 $1,958
19,050
kWh
- - - - - -
02 2.7135: Install occupancy sensors $568 $1,275 $568
5,569
kWh
- - - - - -
03 2.7261: Install timers and/or thermostats $337 $75 $337
3,224
kWh
- - - - - -
04 3.6192: Use a less expensive method of waste removal $456 $60 - - - $456
-
lb
- - -
05 3.6192: Use a less expensive method of waste removal $1,565 $120 - - $1,565
-
gal
- - - -
06 4.231: Purchase equipment instead of leasing $1,632 $230 - $(-8.0)
-
Tgal
- - $(-30.0) $1,800 $(-130.0)
TOTAL RECOMMENDED $6,516 $9,012 $2,863
27,843
kWh
$(-8.0)
-
Tgal
$1,565
-
gal
$456
-
lb
$(-30.0) $1,800 $(-130.0)
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs