Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Blow Molded Plastic
NAICS
n/a
SIC 3082: Unsupported Plastics Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 84,200
ft2
Annual Production 1,800,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $729,310 14,062,720
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $111,493 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7232: Replace existing hvac unit with high efficiency model $87,425 $160,000 $87,425
835,580
kWh
02 2.7491: Insulate glazing, walls, ceilings, and roofs $16,833 $84,000 $16,833
135,111
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $416 $120 $416
8,206
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,535 $1,320 $2,535
47,186
kWh
05 2.3137: Use power during off-peak periods $4,284 - $4,284
-
kWh
TOTAL RECOMMENDED $111,493 $245,440 $111,493
1,026,083
kWh
TOTAL IMPLEMENTED $4,700 $120 $4,700
8,206
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs