Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

777

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0835 #04 Y:2022 Analyze flue gas for proper air/fuel ratio $680 $750
MA0835 #02 Y:2022 Use heat pump for space conditioning $2,773 $7,150
MA0835 #01 Y:2022 Use waste heat from hot flue gases to preheat $10,572 $40,722
MA0836 #08 Y:2022 Reduce the pressure of compressed air to the minimum required $1,781 $625
MA0836 #07 Y:2022 Use heat pump for space conditioning $2,777 $7,150
MA0836 #06 Y:2022 Limit and control secondary combustion air in furnace $7,372 $500
MA0836 #05 Y:2022 Analyze flue gas for proper air/fuel ratio $5,531 $1,500
MA0836 #03 Y:2022 Replace existing chiller with high efficiency model $9,895 $23,950
MA0739 #07 Y:2014 Pay utility bills on time $426 $500
MA0739 #04 Y:2014 Utilize controls to operate equipment only when needed $880 $1,285
MA0739 #03 Y:2014 Install / repair insulation on steam lines $927 $1,570
MA0739 #02 Y:2014 Turn off equipment when not in use $1,543 $500
MA0723 #05 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $3,158 $1,250
MA0723 #03 Y:2013 Lower temperature during the winter season and vice-versa $16,628 $5,000
MA0723 #02 Y:2013 Use cooling tower or economizer to replace chiller cooling $20,745 $110,500
MA0723 #01 Y:2013 Eliminate or reduce compressed air usage $23,304 $90,000
MA0565 #06 Y:2004 Insulate feedwater tank $873 $300
MA0565 #05 Y:2004 Insulate bare equipment $2,705 $754
MA0565 #04 Y:2004 Replace boiler $2,760 $750
MA0565 #02 Y:2004 Not found $57,540 $40,000