ITAC Assessment: UC2412
ITAC logo
ITAC Assessment: UC2412
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Sheet metal
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 60,000
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,609 617,560
kWh
Electricity Demand $36,994 2,430
kW-mo/yr
Electricity Fees $6,422 -
Natural Gas $28,346 2,505
MMBtu
Waste Disposal Costs
Water Usage $2,427 276
Tgal
TOTAL YEARLY COSTS $129,798
RECOMMENDED SAVINGS* $29,603 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $680 - - - $680 -
02 2.8123: Pay utility bills on time $247 - - - $247 -
03 2.8114: Change rate schedules or other changes in utility service $6,358 - - - $6,358 -
04 2.6231: Utilize controls to operate equipment only when needed $2,533 $75 $2,533
28,115
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,630 $1,300 $1,139
12,638
kWh
$491
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $511 $225 $357
3,962
kWh
$154
-
kW-mo/yr
- -
07 2.4239: Eliminate or reduce compressed air usage $1,217 $900 $1,120
12,432
kWh
$97
-
kW-mo/yr
- -
08 2.9114: Use solar heat to make electricty $16,427 $124,645 $19,062
211,560
kWh
- - $(-2,635.0)
TOTAL RECOMMENDED $29,603 $127,145 $24,211
268,707
kWh
$742
-
kW-mo/yr
$7,285 $(-2,635.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs