Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,737

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2515 #07 Y:2025 Replace existing equipment with more suitable substitutes $55,591 $576,000
LS2515 #05 Y:2025 Clean or color roof to reduce solar load $5,344 $26,721
LS2515 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,245 $6,160
LS2515 #02 Y:2025 Install timers and/or thermostats $10,625 $35
LS2515 #01 Y:2025 Regrind, reuse, or sell scrap plastic parts $12,408 -
LS2512 #05 Y:2025 Replace boiler $31,301 $286,589
LS2512 #02 Y:2025 Eliminate old stock and modify inventory control $16,150 $25,000
LS2512 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,432 $1,275
LS0625 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,623 $6,769
LS0625 #03 Y:2025 Clean and maintain refrigerant condensers and towers $1,618 $1,190
LS0625 #01 Y:2025 Reduce space conditioning during non-working hours $3,054 -
LS0525 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,856 $1,224
LS0525 #02 Y:2025 Reduce space conditioning during non-working hours $2,289 $175
LS0525 #01 Y:2025 Chill water to the highest temperature possible $6,053 $250
LS2511 #07 Y:2025 Insulate bare equipment $2,489 $10,000
LS2511 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,592 $2,900
LS2511 #02 Y:2025 Clean and maintain refrigerant condensers and towers $1,062 $288
LS2511 #01 Y:2025 Install occupancy sensors $2,926 $250
LS2510 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $28,682 $21,000
LS2510 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,945 $450