Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,586

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS0524 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $620 $578
LS0524 #02 Y:2024 Install occupancy sensors $340 $200
LS0524 #01 Y:2024 Use computer programs to optimize hvac performance $5,077 $2,040
LS2406 #03 Y:2024 Add/modify equipment to improve drying process $9,410 $28,500
LS2406 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $1,003 $50
LS0424 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $3,011 $1,676
LS0424 #02 Y:2024 Install occupancy sensors $1,937 $200
LS0424 #01 Y:2024 Install timers and/or thermostats $16,625 $1,500
LS0324 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,954 $13,620
LS0324 #02 Y:2024 Use computer programs to optimize hvac performance $12,003 $1,360
LS0324 #01 Y:2024 Install occupancy sensors $2,912 $175
LS2405 #05 Y:2023 Replace existing equipment with more suitable substitutes $155,225 $550,000
LS2405 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $44,207 $25,301
LS2405 #03 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,417 $135
LS2405 #01 Y:2023 Clean and maintain refrigerant condensers and towers $3,278 -
LS0224 #05 Y:2023 Add equipment/ operators to reduce production bottleneck $175,678 $600,000
LS0224 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,104 $1,413
LS0224 #02 Y:2023 Install timers and/or thermostats $1,962 $75
LS0224 #01 Y:2023 Reduce the pressure of compressed air to the minimum required $1,796 $25
LS2404 #05 Y:2023 Utilize higher efficiency lamps and/or ballasts $10,458 $11,138