ITAC Assessment: LS2502
ITAC logo
ITAC Assessment: LS2502
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Industrial Valves
NAICS 332911: Industrial Valve Manufacturing
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 211,185
ft2
Annual Production 6,200
pieces
Production Hrs. Annual 5,616
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $371,048 3,375,023
kWh
Electricity Demand $10,093 3,001
kW-mo/yr
Natural Gas $11,648 2,142
MMBtu
LPG $10,467 208
MMBtu
TOTAL YEARLY COSTS $403,256
RECOMMENDED SAVINGS* $27,361 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7211: Clean and maintain refrigerant condensers and towers $7,922 - $7,922
72,020
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,742 $100 $2,742
24,928
kWh
-
03 2.7135: Install occupancy sensors $6,194 $300 $6,194
56,313
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $889 $45 $889
8,083
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,614 $6,975 $9,026
82,050
kWh
$588
-
kW-mo/yr
TOTAL RECOMMENDED $27,361 $7,420 $26,773
243,394
kWh
$588
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs