ITAC Assessment: LS0924
ITAC logo
ITAC Assessment: LS0924
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Junior Colleges and Technical Institutes
NAICS 611210: Junior Colleges
SIC 8222: Junior Colleges and Technical Institutes
Sales Range less than $500
k
# of Employees 90
Plant Area 294,726
ft2
Annual Production 1
units
Production Hrs. Annual 3,024
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,162 1,434,112
kWh
TOTAL YEARLY COSTS $150,162
RECOMMENDED SAVINGS* $44,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7224: Reduce space conditioning during non-working hours $2,991 - $2,991
28,486
kWh
02 2.2625: Chill water to the highest temperature possible $1,667 $250 $1,667
15,876
kWh
03 2.7135: Install occupancy sensors $5,358 $875 $5,358
51,024
kWh
04 2.7423: Reduce heat gain by window tinting $1,620 $2,352 $1,620
15,428
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,495 $10,257 $5,495
52,337
kWh
06 2.2622: Replace existing chiller with high efficiency model $27,561 $98,980 $27,561
262,483
kWh
TOTAL RECOMMENDED $44,692 $112,714 $44,692
425,634
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs