Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Circuit Boards Assembly and Test
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 52,000
ft2
Annual Production 319,000
units
Production Hrs. Annual 4,250
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,852 1,239,226
kWh
Electricity Demand $44,608 3,722
kW-mo/yr
Electricity Fees $25,514 -
TOTAL YEARLY COSTS $189,974
RECOMMENDED SAVINGS* $667,871 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.3191: Use demand controller or load shedder $16,482 $6,000 $12,021
123,923
kWh
$4,461
-
kW-mo/yr
-
02 2.6231: Utilize controls to operate equipment only when needed $11,318 $25,440 $8,357
86,158
kWh
$2,961
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,655 $13,445 $7,899
81,431
kWh
$2,756
-
kW-mo/yr
-
04 2.7232: Replace existing hvac unit with high efficiency model $7,989 $36,000 $5,105
52,631
kWh
$2,884
-
kW-mo/yr
-
05 2.7425: Clean or color roof to reduce solar load $3,458 $9,470 $3,458
35,654
kWh
- -
06 2.2623: Minimize condenser cooling water temperature $1,257 $5,940 $1,257
12,960
kWh
- -
07 2.4239: Eliminate or reduce compressed air usage $1,007 - $1,007
10,379
kWh
- -
08 2.4224: Upgrade controls on compressors $705 $1,252 $705
7,265
kWh
- -
09 4.446: Automate finishing process $315,000 $181,056 - - $315,000
10 4.112: Replace old machine with new automatic multi-station tool $300,000 $183,056 - - $300,000
TOTAL RECOMMENDED $667,871 $461,659 $39,809
410,401
kWh
$13,062
-
kW-mo/yr
$615,000
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs