Assessment Year | 2007 |
---|---|
Principal Product | Pet toys |
NAICS | 326299: All Other Rubber Product Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
50,000
ft2
|
Annual Production | 3,500,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $36,101 | 970,400 |
kWh
|
$0.037 |
Electricity Demand | $36,250 | 2,418 |
kW-mo/yr
|
$14.99 |
Electricity Fees | $341 | - |
|
- |
Natural Gas | $97,590 | 12,720 |
MMBtu
|
$7.67 |
Fuel Oil #2 | $20,000 | 8,500 |
MMBtu
|
$2.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,450 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,400 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $5,230 | $1,140 |
$5,230
137,500
kWh
|
- | - | - | - | |
02 | 2.4226: Use / purchase optimum sized compressor | $2,710 | $150 |
$770
20,100
kWh
|
$1,940
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $620 | $60 |
$260
6,700
kWh
|
$360
-
kW-mo/yr
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $400 | $190 |
$220
5,800
kWh
|
$180
-
kW-mo/yr
|
- | - | - | |
05 | 2.4225: Install common header on compressors | $320 | $3,450 |
$140
3,600
kWh
|
$180
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,770 | $12,130 |
$2,090
55,000
kWh
|
$2,580
-
kW-mo/yr
|
- | $130 | $(-30.0) | |
07 | 2.9114: Use solar heat to make electricty | $1,560 | $11,000 |
$560
14,600
kWh
|
$1,000
-
kW-mo/yr
|
- | - | - | |
08 | 2.7243: Improve air circulation with destratification fans / other methods | $1,050 | $6,160 |
$(-190.0)
(-4,900)
kWh
|
$(-110.0)
-
kW-mo/yr
|
$1,350
-
MMBtu
|
- | - | |
09 | 2.7492: Use proper thickness of insulation on building envelope | $790 | - |
$790
20,800
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $17,450 | $34,280 |
$9,870
259,200
kWh
|
$6,130
-
kW-mo/yr
|
$1,350
-
MMBtu
|
$130 | $(-30.0) | ||
TOTAL IMPLEMENTED | $6,400 | $14,850 |
$2,740
71,600
kWh
|
$3,660
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs