Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,888

matching recommendations
$
$
ID Description Yearly
Savings
Imp
Cost
IP0196 #06 Y:2024 Install occupancy sensors $1,499 $2,975
IP0196 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,327 $2,497
IP0196 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,126 $42
IP0196 #02 Y:2024 Modify startup/shutdown times $1,880 $40
IP0196 #01 Y:2024 Conserve energy by efficient use of vending machines $507 -
IP0194 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $13,174 $16,475
IP0194 #04 Y:2024 Make a practice of turning off lights when not needed $1,154 -
IP0194 #03 Y:2024 Conserve energy by efficient use of vending machines $1,317 -
IP0194 #02 Y:2024 Use optimum temperature $2,876 -
IP0194 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $4,623 -
IP0189 #05 Y:2024 Use most efficient type of electric motors $43,723 $84,496
IP0189 #04 Y:2024 Install occupancy sensors $1,248 $716
IP0189 #03 Y:2024 Reduce space conditioning during non-working hours $3,852 $325
IP0189 #02 Y:2024 Install compressor air intakes in coolest locations $2,822 -
IP0189 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $4,450 $33
IC0298 #09 Y:2024 Insulate bare equipment $259 $259
IC0298 #08 Y:2024 Lower temperature during the winter season and vice-versa $63 -
IC0298 #07 Y:2024 Turn off equipment during breaks, reduce operating time $352 -
IC0298 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,839 -
IC0298 #04 Y:2024 Utilize energy-efficient belts and other improved mechanisms $14,618 $558