Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,937

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0218 #11 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,999 $4,180
IP0218 #10 Y:2025 Replace fossil fuel equipment with electrical equipment $48,200 $100,000
IP0218 #09 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $64,217 $51,340
IP0218 #08 Y:2025 Turn off equipment during breaks, reduce operating time $4,427 $2,340
IP0218 #07 Y:2025 Turn off equipment when not in use $10,343 $3,625
IP0218 #06 Y:2025 Utilize daylight whenever possible in lieu of artificial light $22,821 $5,550
IP0218 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,187 $440
IP0218 #04 Y:2025 Install occupancy sensors $8,132 $700
IP0218 #03 Y:2025 Reduce space conditioning during non-working hours $4,468 $310
IP0218 #02 Y:2025 Reduce ventilation air $35,653 $3,000
IP0218 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,083 -
UL2516 #08 Y:2025 Install occupancy sensors $149 $254
UL2516 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $49,312 $34,242
UL2516 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $15,881 $3,780
UL2516 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $8,018 -
UL2510 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,769 $3,240
IC0327 #06 Y:2025 Repair and eliminate steam leaks $5,105 $1,367
IC0327 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,206 $226
IP0210 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,730 $24
IP0210 #05 Y:2025 Recover heat from exhausted steam, hot air or hot water $8,048 $908