Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,871

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0189 #05 Y:2024 Use most efficient type of electric motors $43,723 $84,496
IP0189 #04 Y:2024 Install occupancy sensors $1,248 $716
IP0189 #03 Y:2024 Reduce space conditioning during non-working hours $3,852 $325
IP0189 #02 Y:2024 Install compressor air intakes in coolest locations $2,822 -
IP0189 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $4,450 $33
IP7009 #02 Y:2023 Reduce space conditioning during non-working hours $470 $325
IP7009 #01 Y:2023 Conserve energy by efficient use of vending machines $2,166 $665
IC0297 #15 Y:2023 Lower temperature during the winter season and vice-versa $1,222 -
IC0297 #14 Y:2023 Lower temperature during the winter season and vice-versa $119 -
IC0297 #13 Y:2023 Repair and eliminate steam leaks $4,854 $360
IC0297 #12 Y:2023 Eliminate or reduce compressed air usage $8,395 $609
IC0297 #10 Y:2023 Recharge batteries on during off-peak demand periods $6,801 -
IC0297 #08 Y:2023 Reduce the pressure of compressed air to the minimum required $17,754 $36,000
IC0297 #05 Y:2023 Use optimum thickness insulation $2,433 $1,693
IC0297 #04 Y:2023 Insulate bare equipment $26,122 $13,370
IC0297 #03 Y:2023 Insulate bare equipment $2,641 $1,066
IC0297 #02 Y:2023 Insulate bare equipment $5,801 $2,620
IC0297 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $29,288 $1,336
IP0184 #05 Y:2023 Utilize higher efficiency lamps and/or ballasts $4,142 $12,019
IP0184 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $31,216 $17,960