ITAC Assessment: IP0196
ITAC logo
ITAC Assessment: IP0196
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plastic Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 51
Plant Area 68,062
ft2
Annual Production 9,746,454
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,110 1,479,558
kWh
Electricity Demand $43,900 4,466
kW-mo/yr
Electricity Fees $4,429 -
Natural Gas $6,133 675
MMBtu
Waste Disposal Costs
Water Usage $1,010 82
Tgal
Water Disposal $3,010 82
Tgal
TOTAL YEARLY COSTS $228,592
RECOMMENDED SAVINGS* $7,902 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6211: Conserve energy by efficient use of vending machines $507 - $452
4,110
kWh
$55
-
kW-mo/yr
02 4.454: Modify startup/shutdown times $1,880 $40 - $1,880
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,126 $42 $1,126
10,234
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $563 $520 $480
4,368
kWh
$83
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,327 $2,497 $1,986
18,054
kWh
$341
-
kW-mo/yr
06 2.7135: Install occupancy sensors $1,499 $2,975 $1,499
13,627
kWh
-
TOTAL RECOMMENDED $7,902 $6,074 $5,543
50,393
kWh
$2,359
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs