ITAC Assessment: MA0562
ITAC logo
ITAC Assessment: MA0562
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Thermal coatings
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 30,000
ft2
Annual Production 108,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,866 2,081,800
kWh
Electricity Demand $44,481 8,630
kW-mo/yr
Electricity Fees $84 -
Natural Gas $24,790 2,350
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,016

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2622: Replace existing chiller with high efficiency model $22,961 $139,400 $20,118
256,600
kWh
$2,843
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $10,584 $2,465 - - $10,584
-
MMBtu
03 2.7224: Reduce space conditioning during non-working hours $3,445 $650 - - $3,445
-
MMBtu
04 2.7311: Ventilation system to shut off when room is not in use $2,903 - $1,521
19,400
kWh
- $1,382
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,626 $250 $2,626
33,500
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $820 $1,640 $820
17,100
kWh
- -
07 2.7135: Install occupancy sensors $361 $512 $361
4,200
kWh
- -
TOTAL RECOMMENDED $43,700 $144,917 $25,446
330,800
kWh
$2,843
-
kW-mo/yr
$15,411
-
MMBtu
TOTAL IMPLEMENTED $17,016 $3,877 $2,987
37,700
kWh
- $14,029
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs