ITAC Assessment: LS2419
ITAC logo
ITAC Assessment: LS2419
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Rope
NAICS 314994: Rope, Cordage, Twine, Tire Cord, and Tire Fabric Mills
SIC 2298: Cordage and Twine
Sales Range $50
M
to 100
M
# of Employees 90
Plant Area 110,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,920 2,071,920
kWh
Waste Disposal Costs
Water Usage $963 248
Tgal
Water Disposal $1,960 248
Tgal
TOTAL YEARLY COSTS $183,842
RECOMMENDED SAVINGS* $159,615 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Usage Savings Water Disposal Savings Ancillary Material Cost Savings Increase in Production Savings
01 4.424: Improve space comfort conditioning $6,299 $17,640 $6,299
72,402
kWh
- - - -
02 3.3133: Use other waste concentration methods $50,241 $154,466 $(-4,343.0)
(-49,920)
kWh
$193
-
Tgal
$392
-
Tgal
$54,000 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,609 $51,689 $7,609
87,460
kWh
- - - -
04 2.4321: Upgrade obsolete equipment $56,850 $580,000 $9,345
107,410
kWh
- - - $47,505
05 2.9114: Use solar heat to make electricty $38,616 $514,800 $38,616
443,867
kWh
- - - -
TOTAL RECOMMENDED $159,615 $1,318,595 $57,526
661,219
kWh
$193
-
Tgal
$392
-
Tgal
$54,000 $47,505
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs