ITAC Assessment: IP0195
ITAC logo
ITAC Assessment: IP0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plastic Fuel Tanks
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 222
Plant Area 265,010
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,120,524 14,914,464
kWh
Electricity Demand $435,557 34,295
kW-mo/yr
Electricity Fees $6,948 -
Natural Gas $46,613 5,900
MMBtu
Waste Disposal Costs
Water Usage $18,125 11,006
Tgal
TOTAL YEARLY COSTS $1,627,767
RECOMMENDED SAVINGS* $182,993 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $23,407 $750 $23,407
312,093
kWh
-
02 2.2211: Use optimum temperature $9,989 - $9,989
133,190
kWh
-
03 2.6211: Conserve energy by efficient use of vending machines $1,465 - $1,465
19,535
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $9,660 $1,592 $7,252
96,696
kWh
$2,408
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $473 $628 $473
6,304
kWh
-
06 2.2614: Use cooling tower or economizer to replace chiller cooling $97,675 $217,296 $97,675
1,302,338
kWh
-
07 2.7135: Install occupancy sensors $2,446 $10,400 $2,446
32,620
kWh
-
08 2.7232: Replace existing hvac unit with high efficiency model $37,878 $224,750 $36,858
491,436
kWh
$1,020
-
kW-mo/yr
TOTAL RECOMMENDED $182,993 $455,416 $179,565
2,394,211
kWh
$3,428
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs