Assessment Year | 2023 |
---|---|
Principal Product | Chemical/Reagants |
NAICS | 333249: Other Industrial Machinery Manufacturing |
SIC | 3821: Laboratory Apparatus and Furniture |
Sales Range | $100 M to 500M |
# of Employees | 250 |
Plant Area |
90,000
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 2,470
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $305,670 | 4,991,325 |
kWh
|
$0.061 |
Electricity Demand | $121,585 | 8,962 |
kW-mo/yr
|
$13.57 |
Electricity Fees | $80,128 | - |
|
- |
Natural Gas | $2,970 | 238 |
MMBtu
|
$12.48 |
TOTAL YEARLY COSTS | $510,353 | |||
RECOMMENDED SAVINGS* | $126,403 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $108,856 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $41,834 | - |
$41,834
685,808
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,513 | $51,984 |
$20,326
333,212
kWh
|
$6,187
-
kW-mo/yr
|
- | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $22,808 | $580 |
$11,534
189,076
kWh
|
$11,274
-
kW-mo/yr
|
- | |
04 | 2.7425: Clean or color roof to reduce solar load | $10,785 | $37,678 |
$8,967
147,000
kWh
|
$1,818
-
kW-mo/yr
|
- | |
05 | 2.2621: Modify refrigeration system to operate at a lower pressure | $9,196 | $27,500 |
$7,052
115,607
kWh
|
$2,144
-
kW-mo/yr
|
- | |
06 | 2.7496: Install partitions to reduce size of conditioned space | $6,580 | $1,455 |
$3,161
51,820
kWh
|
$3,419
-
kW-mo/yr
|
- | |
07 | 2.7135: Install occupancy sensors | $4,508 | $1,250 |
$4,508
73,894
kWh
|
- | - | |
08 | 2.7241: Install outside air damper / economizer on hvac unit | $2,131 | $1,500 |
$1,629
26,711
kWh
|
$502
-
kW-mo/yr
|
- | |
09 | 2.7229: Air condition only space necessary | $1,771 | $900 |
$848
13,899
kWh
|
$923
-
kW-mo/yr
|
- | |
10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $277 | $1,360 | - | - |
$277
-
MMBtu
|
|
TOTAL RECOMMENDED | $126,403 | $124,207 |
$99,859
1,637,027
kWh
|
$26,267
-
kW-mo/yr
|
$277
-
MMBtu
|
||
TOTAL IMPLEMENTED | $108,856 | $94,352 |
$88,798
1,455,701
kWh
|
$19,781
-
kW-mo/yr
|
$277
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs