ITAC Assessment: MI0423
ITAC logo
ITAC Assessment: MI0423
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Chemical/Reagants
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3821: Laboratory Apparatus and Furniture
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 90,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 2,470
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $305,670 4,991,325
kWh
Electricity Demand $121,585 8,962
kW-mo/yr
Electricity Fees $80,128 -
Natural Gas $2,970 238
MMBtu
TOTAL YEARLY COSTS $510,353
RECOMMENDED SAVINGS* $126,403 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $108,856

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $41,834 - $41,834
685,808
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $26,513 $51,984 $20,326
333,212
kWh
$6,187
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $22,808 $580 $11,534
189,076
kWh
$11,274
-
kW-mo/yr
-
04 2.7425: Clean or color roof to reduce solar load $10,785 $37,678 $8,967
147,000
kWh
$1,818
-
kW-mo/yr
-
05 2.2621: Modify refrigeration system to operate at a lower pressure $9,196 $27,500 $7,052
115,607
kWh
$2,144
-
kW-mo/yr
-
06 2.7496: Install partitions to reduce size of conditioned space $6,580 $1,455 $3,161
51,820
kWh
$3,419
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $4,508 $1,250 $4,508
73,894
kWh
- -
08 2.7241: Install outside air damper / economizer on hvac unit $2,131 $1,500 $1,629
26,711
kWh
$502
-
kW-mo/yr
-
09 2.7229: Air condition only space necessary $1,771 $900 $848
13,899
kWh
$923
-
kW-mo/yr
-
10 2.1233: Analyze flue gas for proper air/fuel ratio $277 $1,360 - - $277
-
MMBtu
TOTAL RECOMMENDED $126,403 $124,207 $99,859
1,637,027
kWh
$26,267
-
kW-mo/yr
$277
-
MMBtu
TOTAL IMPLEMENTED $108,856 $94,352 $88,798
1,455,701
kWh
$19,781
-
kW-mo/yr
$277
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs