ITAC Assessment: IP0197
ITAC logo
ITAC Assessment: IP0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Automotive Plastic Components
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 380
Plant Area 523,000
ft2
Annual Production 13,000,000
pieces
Production Hrs. Annual 3,995
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,810,158 17,560,578
kWh
Electricity Fees $5,743 -
Natural Gas $275,541 72,215
MMBtu
Waste Disposal Costs
Water Usage $36,251 4,714
Tgal
TOTAL YEARLY COSTS $2,127,692
RECOMMENDED SAVINGS* $56,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $33,478 $697 $33,478
325,028
kWh
-
02 2.7224: Reduce space conditioning during non-working hours $3,662 $320 $2,962
28,754
kWh
$700
-
MMBtu
03 2.7135: Install occupancy sensors $1,000 $1,506 $1,000
9,707
kWh
-
04 2.2414: Use waste heat from hot flue gases to preheat $8,370 $13,000 $8,370
81,259
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,867 $18,107 $9,867
95,799
kWh
-
TOTAL RECOMMENDED $56,377 $33,630 $55,677
540,547
kWh
$700
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs