ITAC Assessment: GT0893
ITAC logo
ITAC Assessment: GT0893
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Packaging
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 113,000
ft2
Annual Production 2,000,000,000
pieces
Production Hrs. Annual 8,472
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,236,279 20,603,709
kWh
Electricity Demand $1 37,419
kW-mo/yr
Electricity Fees $169,131 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,537 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4314: Use synthetic lubricant $14,406 - $14,406
215,654
kWh
-
02 2.8114: Change rate schedules or other changes in utility service $4,070 $4,000 - $4,070
03 2.4239: Eliminate or reduce compressed air usage $41,547 $70,000 $41,547
621,960
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $10,114 - $10,114
151,402
kWh
-
05 2.4323: Use optimum size and capacity equipment $9,400 - $9,400
141,000
kWh
-
TOTAL RECOMMENDED $79,537 $74,000 $75,467
1,130,016
kWh
$4,070
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs