| Assessment Year | 2024 |
|---|---|
| Principal Product | Aircraft Hangars |
| NAICS | 488119: Other Airport Operations |
| SIC | 4581: Airports, Flying Fields, and Airport Terminal Services |
| Sales Range | $500 k to 1M |
| # of Employees | 71 |
| Plant Area |
161,991
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $51,587 | 387,170 |
kWh
|
$0.13 |
| Electricity Fees | $3,611 | - |
|
- |
| Natural Gas | $18,184 | 2,321 |
MMBtu
|
$7.83 |
| TOTAL YEARLY COSTS | $73,382 | |||
| RECOMMENDED SAVINGS* | $14,691 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $807 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $11,465 | $5,250 |
$9,290
69,745
kWh
|
$2,175
-
MMBtu
|
|
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $112 | $93 |
$112
842
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $312 | $325 |
$312
2,340
kWh
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,365 | $2,993 |
$1,365
10,244
kWh
|
- | |
| 05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $327 | $769 | - |
$327
-
MMBtu
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $695 | $1,653 |
$695
5,217
kWh
|
- | |
| 07 | 2.7135: Install occupancy sensors | $415 | $1,100 |
$415
3,119
kWh
|
- | |
| TOTAL RECOMMENDED | $14,691 | $12,183 |
$12,189
91,507
kWh
|
$2,502
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $807 | $1,746 |
$807
6,059
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs