ITAC Assessment: IP7022
ITAC logo
ITAC Assessment: IP7022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Aircraft Hangars
NAICS 488119: Other Airport Operations
SIC 4581: Airports, Flying Fields, and Airport Terminal Services
Sales Range $500
k
to 1
M
# of Employees 71
Plant Area 161,991
ft2
Annual Production 1
units
Production Hrs. Annual 2,600
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,587 387,170
kWh
Electricity Fees $3,611 -
Natural Gas $18,184 2,321
MMBtu
TOTAL YEARLY COSTS $73,382
RECOMMENDED SAVINGS* $14,691 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $11,465 $5,250 $9,290
69,745
kWh
$2,175
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $112 $93 $112
842
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $312 $325 $312
2,340
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,365 $2,993 $1,365
10,244
kWh
-
05 2.7491: Insulate glazing, walls, ceilings, and roofs $327 $769 - $327
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $695 $1,653 $695
5,217
kWh
-
07 2.7135: Install occupancy sensors $415 $1,100 $415
3,119
kWh
-
TOTAL RECOMMENDED $14,691 $12,183 $12,189
91,507
kWh
$2,502
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs