Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,703

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0369 #05 Y:2024 Install compressor air intakes in coolest locations $3,599 $7,900
MZ0369 #04 Y:2024 Install occupancy sensors $23,108 $9,760
MZ0369 #02 Y:2024 Replace existing chiller with high efficiency model $3,668 $35,570
MZ0366 #04 Y:2024 Replace existing chiller with high efficiency model $11,668 $59,968
MZ0366 #03 Y:2024 Install compressor air intakes in coolest locations $3,674 $14,000
MZ0366 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $9,395 $800
MZ0367 #05 Y:2024 Lower temperature during the winter season and vice-versa $2,969 $3,120
MZ0367 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $852 $400
MZ0367 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $5,987 $1,000
MZ0365 #06 Y:2024 Utilize controls to operate equipment only when needed $10,036 $6,500
MZ0365 #04 Y:2024 Make a practice of turning off lights when not needed $96 $520
MZ0365 #03 Y:2024 Eliminate or reduce compressed air usage $3,741 $805
MZ0365 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $6,949 $1,000
IC0299 #08 Y:2023 Insulate bare equipment $1,981 $847
IC0299 #06 Y:2023 Burn a less expensive grade of fuel $447,899 $23,503
IC0299 #03 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $554 $642
IC0299 #02 Y:2023 Repair and eliminate steam leaks $23,893 $3,458
IC0292 #07 Y:2023 Insulate bare equipment $19,216 $10,388
IC0292 #06 Y:2023 Recharge batteries on during off-peak demand periods $2,786 -
IC0292 #02 Y:2023 Eliminate or reduce compressed air usage $6,518 $9,738