ITAC Assessment: MZ0369
ITAC logo
ITAC Assessment: MZ0369
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product stamped parts for motor vehicles
NAICS 336111: Automobile Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $50
M
to 100
M
# of Employees 162
Plant Area 196,000
ft2
Annual Production 14,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,660 5,201,408
kWh
Electricity Demand $283,460 11,140
kW-mo/yr
Natural Gas $80,614 10,307
MMBtu
TOTAL YEARLY COSTS $557,734
RECOMMENDED SAVINGS* $104,688 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,842 $16,170 $3,842
103,865
kWh
- - -
02 2.2622: Replace existing chiller with high efficiency model $3,668 $35,570 $1,135
30,680
kWh
$2,533
-
kW-mo/yr
- -
03 2.9114: Use solar heat to make electricty $62,544 $926,250 $48,369
1,307,289
kWh
$14,175
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $23,108 $9,760 - - $23,108
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $3,599 $7,900 $1,515
40,945
kWh
$2,084
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $5,987 $1,000 $2,721
62,142
kWh
$3,266
-
kW-mo/yr
- -
07 2.7111: Reduce illumination to minimum necessary levels $1,940 $870 $554
14,976
kWh
$762
-
kW-mo/yr
- $624
TOTAL RECOMMENDED $104,688 $997,520 $58,136
1,559,897
kWh
$22,820
-
kW-mo/yr
$23,108
-
MMBtu
$624
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs