ITAC Assessment: MZ0365
ITAC logo
ITAC Assessment: MZ0365
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product gas, electric and wood fireplace
NAICS 332510: Hardware Manufacturing
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $100
M
to 500
M
# of Employees 257
Plant Area 450,000
ft2
Annual Production 101,749
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,008 6,445,500
kWh
Electricity Demand $407,629 20,685
kW-mo/yr
Natural Gas $172,475 44,634
MMBtu
TOTAL YEARLY COSTS $856,112
RECOMMENDED SAVINGS* $305,514 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $6,949 $1,000 $2,928
68,088
kWh
$4,021
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,558 $75,320 $17,558
408,329
kWh
- - -
03 2.4239: Eliminate or reduce compressed air usage $3,741 $805 $154
3,575
kWh
$3,587
-
kW-mo/yr
- -
04 2.7124: Make a practice of turning off lights when not needed $96 $520 $96
2,232
kWh
- - -
05 2.2622: Replace existing chiller with high efficiency model $267,134 $875,396 $37,821
879,564
kWh
$45,313
-
kW-mo/yr
- $184,000
06 2.6231: Utilize controls to operate equipment only when needed $10,036 $6,500 - - $10,036
-
MMBtu
-
TOTAL RECOMMENDED $305,514 $959,541 $58,557
1,361,788
kWh
$52,921
-
kW-mo/yr
$10,036
-
MMBtu
$184,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs