ITAC Assessment: CO0275
ITAC logo
ITAC Assessment: CO0275
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Flour and Corn Tortilla Products
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 285
Plant Area 44,000
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 6,365
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,340 3,710,141
kWh
Natural Gas $144,159 74,309
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,430

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $7,880 $12,500 - $7,880
-
MMBtu
02 2.2135: Repair and eliminate steam leaks $700 $70 - $700
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,140 $2,370 $2,140
47,186
kWh
-
04 2.2511: Insulate bare equipment $510 $790 - $510
-
MMBtu
05 2.2511: Insulate bare equipment $250 $640 - $250
-
MMBtu
06 2.4239: Eliminate or reduce compressed air usage $3,190 $8,500 $3,190
70,340
kWh
-
07 2.4133: Use most efficient type of electric motors $1,730 $5,120 $1,730
38,101
kWh
-
TOTAL RECOMMENDED $16,400 $29,990 $7,060
155,627
kWh
$9,340
-
MMBtu
TOTAL IMPLEMENTED $2,430 $5,190 $1,730
38,101
kWh
$700
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs