ITAC Assessment: IA0567
ITAC logo
ITAC Assessment: IA0567
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product baby care products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 298,160
ft2
Annual Production 250,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $526,499 8,516,800
kWh
Electricity Demand $229,868 18,576
kW-mo/yr
Natural Gas $34,517 5,136
MMBtu
TOTAL YEARLY COSTS $790,884
RECOMMENDED SAVINGS* $68,763 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $43,409 $75,175 $29,163
486,023
kWh
$14,246
-
kW-mo/yr
02 2.4226: Use / purchase optimum sized compressor $8,956 $7,888 $5,953
99,220
kWh
$3,003
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $11,535 $1,320 $8,240
137,327
kWh
$3,295
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,604 $8,596 $2,303
38,369
kWh
$1,301
-
kW-mo/yr
05 2.2696: Use excess cold process fluid for industrial cooling needs $1,259 $500 $487
8,112
kWh
$772
-
kW-mo/yr
TOTAL RECOMMENDED $68,763 $93,479 $46,146
769,051
kWh
$22,617
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs