ITAC Assessment: MZ0366
ITAC logo
ITAC Assessment: MZ0366
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product metal cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $100
M
to 500
M
# of Employees 112
Plant Area 414,000
ft2
Annual Production 1,231,711,104
pieces
Production Hrs. Annual 4,368
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,232,879 31,813,600
kWh
Electricity Demand $1,206,380 52,999
kW-mo/yr
Natural Gas $742,452 322,266
MMBtu
Waste Disposal Costs
Water Usage $152,879 69,092
Tgal
Water Disposal $249,435 69,092
Tgal
TOTAL YEARLY COSTS $3,584,025
RECOMMENDED SAVINGS* $193,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings
01 3.4159: Replace treated water with well / surface water $21,410 $168,000 - - $11,785
-
Tgal
$9,625
-
Tgal
02 2.4231: Reduce the pressure of compressed air to the minimum required $9,395 $800 $3,609
92,542
kWh
$5,786
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $3,674 $14,000 $3,674
94,198
kWh
- - -
04 2.2622: Replace existing chiller with high efficiency model $11,668 $59,968 $3,884
99,591
kWh
$7,784
-
kW-mo/yr
- -
05 2.9114: Use solar heat to make electricty $147,343 $2,297,063 $147,343
3,778,038
kWh
- - -
TOTAL RECOMMENDED $193,490 $2,539,831 $158,510
4,064,369
kWh
$13,570
-
kW-mo/yr
$11,785
-
Tgal
$9,625
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs