Assessment Year | 2024 |
---|---|
Principal Product | Flexible packaging for food products |
NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 31 |
Plant Area |
60,000
ft2
|
Annual Production | 2,481,226,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $40,806 | 931,232 |
kWh
|
$0.044 | |
Electricity Demand | $78,832 | 2,993 |
kW-mo/yr
|
$26.34 | |
Natural Gas | $25,074 | 5,566 |
MMBtu
|
$4.50 | |
Waste Disposal Costs | |||||
Water Usage | $3,969 | 337 |
Tgal
|
$11.78 | |
Water Disposal | $12,325 | 270 |
Tgal
|
$45.73 | |
TOTAL YEARLY COSTS | $161,006 | ||||
RECOMMENDED SAVINGS* | $28,770 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,987 | $1,000 |
$2,721
62,142
kWh
|
$3,266
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $2,464 | $5,400 |
$1,119
25,539
kWh
|
$1,345
-
kW-mo/yr
|
- | |
03 | 2.4239: Eliminate or reduce compressed air usage | $16,498 | $12,000 |
$8,675
198,080
kWh
|
$7,823
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $852 | $400 |
$409
8,411
kWh
|
$443
-
kW-mo/yr
|
- | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $2,969 | $3,120 |
$1,690
38,604
kWh
|
- |
$1,279
-
MMBtu
|
|
TOTAL RECOMMENDED | $28,770 | $21,920 |
$14,614
332,776
kWh
|
$12,877
-
kW-mo/yr
|
$1,279
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs