ITAC Assessment: SF0023
ITAC logo
ITAC Assessment: SF0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Bread
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 24,000
ft2
Annual Production 19,240,000
pieces
Production Hrs. Annual 8,112
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,662 1,503,224
kWh
Natural Gas $173,415 100,571
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,425 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,940

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $4,476 $2,334 $4,476
45,721
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,409 $2,795 $3,409
34,584
kWh
-
03 2.7135: Install occupancy sensors $2,616 $686 $2,616
26,671
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $916 $420 $916
9,379
kWh
-
05 2.4314: Use synthetic lubricant $898 - $898
9,086
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,157 $400 - $1,157
-
MMBtu
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,616 $2,050 $1,800
12,603
kWh
$(-184.0)
-
MMBtu
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,337 $700 $1,337
13,775
kWh
-
TOTAL RECOMMENDED $16,425 $9,385 $15,452
151,819
kWh
$973
-
MMBtu
TOTAL IMPLEMENTED $9,940 $5,529 $8,783
89,391
kWh
$1,157
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs