Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,916

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0256 #05 Y:2025 Install compressor air intakes in coolest locations $1,150 $5,288
WM0256 #04 Y:2025 Utilize energy-efficient belts and other improved mechanisms $3,409 $210
WM0256 #03 Y:2025 Use optimum size and capacity equipment $9,367 $29,591
WM0256 #02 Y:2025 Recover waste heat from equipment $14,873 $10,258
WM0256 #01 Y:2025 Use antifreeze in cooling towers to allow winter use $27,625 $19,139
WM0255 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,026 $2,200
WM0255 #04 Y:2025 Use waste heat from hot flue gases to preheat incoming fluids $13,473 $75,000
WM0255 #03 Y:2025 Install smaller boiler (increase high fire duty cycle) $34,808 $250,000
WM0255 #02 Y:2025 Use or replace with energy efficient substitutes $34,848 $200,000
WM0255 #01 Y:2025 Repair or replace steam traps $169,641 $20,561
WM0254 #04 Y:2025 Recharge batteries on during off-peak demand periods $760 $1,860
WM0254 #03 Y:2025 Install compressor air intakes in coolest locations $848 $1,376
WM0254 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,124 $4,125
WM0254 #01 Y:2025 Reduce space conditioning during non-working hours $2,667 -
WM0253 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $246 $333
WM0253 #06 Y:2025 Install occupancy sensors $480 $405
WM0253 #05 Y:2025 Reduce space conditioning during non-working hours $4,185 $520
WM0253 #04 Y:2025 Close holes and openings in building such as broken windows $4,905 $580
WM0253 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $5,066 -
WM0253 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $10,181 $12,600